Fiber Optic Installation

Fiber optic installation contractor for Boise.

Single-mode and multi-mode fiber for backbone, inter-building, and high-speed runs. Fusion splicing and OTDR certification on every termination.

The Angle

Backbone work, done by people who know the difference.

Fiber is unforgiving. A bad splice or a dirty connector shows up at the network engineer’s desk, not at install. Every termination we make is fusion-spliced or polished, then OTDR-tested both ways.

What is included
  • Single-mode (OS2) and multi-mode (OM3 / OM4) installs
  • Indoor riser, plenum, and outdoor armored runs
  • Inter-building and across-campus fiber
  • Fusion splicing with documented loss readings
  • LC, SC, and MTP/MPO termination
  • OTDR bi-directional certification with PDF reports
How the work runs
  1. 1

    Pathway design

    Innerduct, conduit, or aerial — confirmed against the site survey, not the print.

  2. 2

    Pull & terminate

    Strand counts pulled with proper tension limits. Fusion splices in trays, polished connectors on patch panels.

  3. 3

    Bi-directional OTDR test

    Every strand tested both ways. Results delivered as PDF with link-loss summary.

Bid Requests Welcome

Add us to the bid list.

Drop your plans, project name, and timeline. We return a complete commercial cabling bid — typically within 3 business days.